Use this worksheet to explore a production assumption before requesting operating evidence. Start with a rate assumed while the line is running, then identify excluded time and any further runtime or reject assumptions. The output is a scenario calculated from your inputs; it is not a forecast, guarantee or assessment of a listed line.
Calculate your scenario
Example values are illustrative. Use a dot or comma for decimals, without thousands separators. This calculation stays in your browser.
Define the rate and the available time
State the counting unit and keep it consistent throughout the scenario. Use the assumed container rate while running and select its minute or hour unit. Subtract time you have explicitly excluded from the planned window. If your rate already represents net acceptable output across a complete shift, applying additional losses may count the same effect twice.
Separate excluded time from further runtime losses
The runtime fraction applies to the time remaining after the stated exclusions. It represents additional time assumed to be running. Do not put the same interruption in both excluded minutes and the runtime reduction. If those categories cannot be separated, simplify the scenario and record what the single assumption includes.
Apply the reject assumption once
The reject fraction represents units assumed unacceptable among those produced during running time. Set it consistently with the rate definition. The worksheet multiplies by one minus that fraction and rounds down to a whole unit. This arithmetic does not evaluate why a unit is rejected or establish any acceptable quality threshold.
Use the scenario to request better evidence
Save the assumptions with the equipment scope and proposed product or package. Replace assumptions with comparable measured data when it becomes available. Keep short demonstrations, rated machine speeds and measured good-output counts distinct. A useful planning discussion asks which observations would change the scenario and who can supply them for the actual connected line.
Hypothetical planning example
floor(6,000 units/hour × (480 − 60) minutes ÷ 60 × 0.80 × (1 − 0.02)) = 32,928 units
An assumed running rate of 6,000 units/hour, 420 remaining minutes, 80% further runtime and 2% rejects. The result follows those assumptions only.
Check these assumptions
- Rate means containers in the selected time unit while running
- Excluded minutes and runtime losses do not overlap
- Rejects are not already deducted from the rate
- Results are whole units and remain a scenario