Use a line map to compare modules, interfaces and production responsibilities. A complete-line purchase needs a clear boundary between supplied equipment and the work still required on site.
- Can the seller provide a complete equipment list and layout?
- Who is responsible for connecting controls and commissioning the assembled line?
Define integration responsibilities
Assign responsibility for mechanical assembly, control connections, safety review and commissioning in the project scope. Match that scope to the equipment list and destination layout. Clarify acceptance criteria and outstanding work before dismantling starts.
Plan before dismantling
Document layout, cable and pipe routes, reference points, software backups, alignment and the sequence needed for reassembly.
Protect every component
Define cleaning, preservation, labelling, packing, lifting points, transport frames and environmental protection for the journey.
Prepare the destination
Confirm utilities, foundations, access, safety compliance, integration, commissioning resources and acceptance criteria.