A filler can hand off a container that is open, closed or awaiting the next operation. Mark the precise location and state at handoff before comparing offers. Identify which party is responsible for bottle support, the first downstream signal and the initial product or package check.
Put the handoff into the acceptance test
Ask the filler and packaging suppliers to agree the upstream and downstream conditions. Test a representative run and a planned restart. Record the first point where accepted output is counted. Make any transfer or reject equipment a named item in the offer.
| Boundary item | Confirmation | Owner |
|---|---|---|
| Container state at discharge | Product and closure specification | ___ |
| First transfer point | Height, guide and support | ___ |
| Stop and release signals | Agreed line behaviour | ___ |
| Initial inspection or reject | Method, equipment and disposition | ___ |
Use the line handover guide to assign included modules
Check the filler exit before purchase
Send the discharge layout, bottle state, first downstream machine and expected output.